Boiling equipment V15M

The boiling equipment in copper steel is used for the production of beer wort in both, the infusion as well as the decoction way of cooking. The boiling equipment kit consists of three containers: a mash kettle and a filter tank     which is mounted above a swirl tank. The production of the boiling equipment per batch is up to approximately 1 650 liters of beer wort (= 1 500 liters of beer).

The mash kettle is equipped with a steam bottom and a steam duplex for a steam heating. To the boiling equipment V15M, we recommend the electric steam generator BM460dual or gas steam generator with output at least 150kg of steam per hour.

This boiling equipment can be made in semiautomatic or fully automatic operating mode. In the semiautomatic mode, all of the valves are manual, except the valves of filling with water and steam. These are pneumatic and controlled from the touch screen. In the fully automatic mode, all of the valves are pneumatic and controlled from the touch screen.  There are several recipes in the PLC, according to which the boiling equipment will automatically lead the whole process of cooking the beer wort.

Управления:
1) Полуавтомат
2) Полностью автоматический
Параметры: Заторно-сусловарочный котел
Реальная емкость2 308 л
Размер1 500 мм
Паровое днище, паровая рубашка – 2x пневм. паровой клапан Norgren.
Свет, санитарный душ, слив конденсата пара, мешалка с четырьмя плечами с коробкой передач
Изоляция 50 мм пластифицированная вата
Параметры: Фильтр чан
Реальная емкость1 769 л
Размер диаметр1 500 мм
Разрыхлитель с коробкой передач и двигателем и преобразователем частоты2 плеча, 8 лопат
Освещение, санитационный душ, трехходовой клапан со смотровым стеклом
Выброс дробины, оборудование для автомат. выброса дробины
Изоляция 50 мм пластифицированная вата
Параметры: Вирпул
Реальная емкость:1 539 л
Размер:1 500 мм
Санитационный душ, тангенциальная форсунка, указатель уровня, предохранительный клапан
Изоляция 50 мм пластифицированная вата

The boiling equipment includes all the necessary piping and electric installation including the integrated fully equipped and fully stainless steel switchboard, which fits into the whole design of the boiling equipment. Both of the vessels are provided with a unique upper sanitation manhole, adapted to easy one-hand operation.

It is also possible to equip the boiling equipment with a vapor condenser with a heat exchanger or with a manhole of the transporter of the grinded malt. The boiling equipment is mounted on a podium with stairs, a sink with battery and cooling for the samples. Because of the transportation, the boiling equipment kit is demountable.

 

to top button